BYOW
(Bring Your Own Water)

Is this building to be waterless? The plumbing drawings indicate the need for a 2-1/2 inch water main into the building, but the civil/site plans do not provide it.

Note: AVW is an abbreviation for "At Variance With."

Nigro Firm: Example error in construction drawings showing missing water main into building

 

Back to Example Errors